Advait Green Recycling

Pollution Control Devices

Emissions Have a Limit. So Should Yours.

Air scrubbers, dust collectors, effluent treatment plants and stack monitoring systems - engineered, installed and maintained to keep your emissions inside the consent limits written on your licence.

Dust Collection - Pulse-Jet Bag Filters

The Challenge

Consent to Operate Is Only as Good as Your Equipment

Every industrial unit operating in India holds a Consent to Operate issued under the Air (Prevention and Control of Pollution) Act, 1981 and the Water (Prevention and Control of Pollution) Act, 1974. That consent specifies exact limits for particulate matter, gaseous emissions and effluent parameters - and State Pollution Control Boards test against them without notice.

The gap between compliance and violation is almost always equipment: an undersized scrubber, a bag filter past its service life, an ETP running outside its design load. Penalties escalate quickly, from show-cause notices to closure directions under Section 33A.

Advait Green designs, supplies, installs and maintains pollution control equipment sized to your actual process load - not a catalogue approximation. Every installation is commissioned with performance testing against the parameters on your consent order.

Pollution Control Devices

CPCB / GPCB Compliant

Design, supply, installation & AMC

Equipment Range

Devices We Supply & Service

Air Scrubbers

Air Scrubbers

Wet scrubbers, venturi scrubbers and packed-bed towers for acid fumes, alkali vapours, ammonia and odour control. Sized against your actual gas flow rate, inlet concentration and required removal efficiency, with corrosion-resistant FRP or PP construction selected for your chemistry.

01 / 06
Dust Collectors & Bag Filters

Dust Collectors & Bag Filters

Pulse-jet bag houses, cartridge filters and cyclone separators for particulate control in grinding, shredding, material handling and furnace operations. Filter media selected for temperature, abrasiveness and moisture - with differential pressure monitoring built in.

02 / 06
Effluent Treatment Plants

Effluent Treatment Plants

Physico-chemical and biological ETPs covering equalisation, neutralisation, clarification, aeration and sludge dewatering. Designed to bring effluent within the inlet parameters of your CETP or within direct-discharge norms where applicable.

03 / 06
Sewage Treatment Plants

Sewage Treatment Plants

Packaged and civil STPs for industrial townships, commercial complexes and institutional campuses. MBBR, SBR and MBR configurations with treated water suitable for flushing, gardening and cooling tower make-up.

04 / 06
Fume Extraction Systems

Fume Extraction Systems

Capture hoods, ducting networks, centrifugal blowers and stack assemblies for welding fumes, soldering fumes, plating baths and solvent operations. Designed for adequate capture velocity at the source, not just extraction at the roof.

05 / 06
Monitoring & Instrumentation

Monitoring & Instrumentation

Online continuous emission monitoring systems (OCEMS), stack sampling ports, effluent flow meters and pH/TSS analysers - including connectivity to the CPCB and State Board servers where your category mandates it.

06 / 06

How We Work

From Site Survey to Commissioned System

01

Site Assessment

Our engineers survey your process, measure actual gas or effluent load, and read your consent order - so the design targets your real numbers, not assumed ones.

02

Engineering & Design

Equipment sizing, material selection, general arrangement drawings and a documented basis of design showing how each consent parameter will be met.

03

Approval Support

Drawings, specifications and technical justification prepared in the format State Pollution Control Boards expect for consent amendment or renewal.

04

Fabrication & Installation

Fabrication to approved drawings, site erection, ducting, electrical integration and safety interlocks - executed with minimal disruption to your production schedule.

05

Commissioning & Testing

Performance trials with third-party stack or effluent analysis, confirming measured results against the limits on your consent before handover.

06

Operation & Maintenance

Annual maintenance contracts covering media replacement, blower servicing, instrument calibration and periodic performance verification.

Why It Matters

Why Correctly Sized Equipment Pays for Itself

Consent Compliance

Equipment sized against the actual parameters on your consent order - so a surprise inspection is an inconvenience, not a closure risk.

Penalty Avoidance

Show-cause notices, bank guarantee forfeiture and Section 33A closure directions cost far more than the equipment that prevents them.

Lower Running Cost

Right-sized blowers and correctly specified filter media cut power draw and consumable replacement - an oversized system wastes energy every hour it runs.

Genuine Emission Reduction

Measurable reduction in particulate and gaseous discharge - the environmental outcome the regulation was actually written for.

Safer Workplaces

Effective fume and dust capture at the source protects operators from respiratory exposure and supports your ISO 45001 obligations.

Audit-Ready Records

Design basis, commissioning reports and maintenance logs kept in one place - ready for board inspection, ESG reporting or customer audit.

Hover to pause

Why Us

Why Advait Green for Pollution Control Equipment

Engineering-led design, performance-tested commissioning and long-term maintenance - from a partner who also understands the compliance paperwork behind the equipment.

CPCBNorm-Compliant Design
24x7Breakdown Support
AMCMaintenance Contracts
TurnkeyDesign to Commissioning
OCEMSOnline Monitoring Ready
Pan-IndiaInstallation & Service
100%Performance Tested
10+Years of Engineering
Regulatory

Built Around Your Consent Conditions

Pollution control equipment is not judged on its specification sheet. It is judged on whether the stack and effluent readings taken during an inspection fall inside the limits written on your Consent to Operate.

We start from that document. Every system we design references the specific parameters and limits applicable to your category and scale, and every handover includes the test results that demonstrate compliance.

Talk to Our Engineering Team

Consent Order Review

We read your existing consent and identify every parameter the equipment must satisfy.

Design Basis Documentation

A written calculation trail showing how the sizing achieves each required removal efficiency.

Third-Party Performance Testing

Commissioning trials with NABL-accredited laboratory analysis of stack or effluent samples.

Scheduled Maintenance

AMC visits timed around your consent renewal cycle so records are current when the board asks.

Not Sure Your Current System Still Meets Its Limits?

Send us your consent order and a description of your process. We will tell you honestly whether your existing equipment is adequate - and what it would take if it is not.